The Ultimate Guide To Drilling Rigs - Jcdrill

In the mineral exploration drilling business, drilling rigs and equipment are critical to winning bids, completing contracts and making money. Buying a new rig is a big decision and many variables and factors can influence that decision. The biggest question one must answer is, "Will this rig make money? Or will it cost more than other options that can achieve the same goals for less?"

If you are looking for more details, kindly visit JK Drilling.

Now that the market is growing slowly, many drilling contractors are deciding whether they should rebuild idle rigs or buy new ones.

Operations managers know which components (engines, valves, assemblies, etc.) need to be replaced, and they usually have a fairly accurate idea of the cost of rebuilding iconic rigs in their fleet. If the cost of rebuilding is close to the cost of buying a new rig, they may choose to conduct a full audit to examine each rig, assess the inventory of spare parts and check maintenance records to get more accurate information to compare the cost of getting the rig ready to work again.

 Drilling Rig

1. Availability

As the market improves, everyone can expect longer lead times - whether you are rebuilding or buying new. When the market is down or very low, stocks increase, factories are not busy building new rigs and lead times are reduced. As the market improves and contracts increase, inventories decrease, factories are busy building more rigs and lead times tend to increase. Ultimately, lead times vary from manufacturer to manufacturer.

2. Resources

In addition to cost, other factors include whether the drilling company has the time, talent and capacity to overhaul a rig that is idle and needs work. Overhauls can take three to four months and require facilities, tools, a labour pool of mechanics (who may already be working on other rigs to keep them running), and a contract for the knowledge to get the rig ready for drilling.

3. Self-sustaining rod handling equipment

Rigs with rod handling equipment typically have fewer hand and back injuries to crews, as well as less overall stress and strain. Mechanised rod handling also saves on labour costs and staffing, as no additional staff are required to handle the rod manually. In addition, as drilling service providers with newer equipment with rod handling capabilities are well known in the market, you may be invited to participate in more tenders. When rod handling is first introduced, productivity suffers as machine rod handling is not as fast as manual rod handling. However, productivity can be maintained by using newer technology.

 Rock Blasting Drilling Rig 

4. Reliability

Used rigs are usually more prone to breakdowns than new rigs, and downtime can affect hard-won drilling contracts. Costs can add up quickly due to lost productivity, rig uptime contractual obligations and repairing rigs. A well-maintained drilling fleet in good operating condition not only contributes to productivity, but also prevents contractors from being dismissed from contracts or sites.

5. Price

When buying a new exploration or production rig it can be tempting to shop for price as there are many low cost options out there. However, as with any other major purchase, it is important to assess the total cost of ownership. A lower priced rig may actually have a higher total cost of ownership. Taking the time to price important replacement parts and spares can prove to save money in the long run.

Another thing to consider is the availability of these components. When buying a low-cost rig from a company that does not have a global presence, the availability of local spares and delivery times for replacement parts can affect your profits. Many smaller manufacturers only support their customers on a regional basis.

The reliability gained from buying high quality components means that components don't have to be replaced as often, which means that it costs less money to run that rig for longer uptime than if you were to buy something at a lower price.

If you are looking for more details, kindly visit Crawler Mounted Pneumatic Tophammer Drill Rig.

Routine Maintenance of Drilling Rig Machine

1. Items to be checked regularly by the drilling rig machine

(1) Check the main structural conditions of the drilling rig, structural connection bolts, structural connection pins, welds of structural parts, basket structure and safety protection conditions, especially before entering the site, please ask a qualified unit to do it. The safety performance is tested, and it can be used only after being qualified;

(2) Regularly check the condition of various power heads, working cylinders, drill bits and drill rods;

(3) Regularly check the hoist drum anti-wire rope shedding device, the height of both sides, the condition of the drum wall, the number of turns of the wire rope tail on the drum, especially the condition of the brake port should be checked at any time for key items; 

(4) Inspection of the electrical system. The main inspection items are: special electric box setting and short-circuit protection and leakage protection devices, emergency power-off switches, electric box shock absorbers, fixing of cables on working devices, lighting circuits, and grounding wires are strictly prohibited from loading flow zero line, etc.;

2. Items that the drilling rig machine should check at any time

(1) Check the consolidation of steel wire rope ends;

The contents of the wire rope inspection are: the number of safety turns of the wire rope, the selection, installation, and lubrication of the wire rope, the inspection of the wire rope defects, such as the diameter and wear of the wire rope, the number of broken wires in the wire rope, etc.;

(2) Check the pulley system of the drilling rig at any time. The main inspection items are: the condition of the pulley body, and the anti-skip rope device of the transition pulley;

(3) Inspect the walking system of the drilling rig at any time. The main inspection items are: the pipe running of the pile machine, the condition of the clamp and the hook pipe system, and the laying of sleepers;

3. Make a good maintenance record of the drilling rig machine, and keep a detailed record of the replacement parts to ensure that the parts are used within the validity period, or to keep track of the next replacement time;

4. If the drilling rig machine is found to be faulty, the operation should be stopped immediately, and it should not be used until the fault is eliminated.

If you want to learn more, please visit our website DTH Drill Bits.